ND FLAP 704(1) AND 795(1) Magpie & Whitetail Crossings
Agency: | |
---|---|
Level of Government: | Federal |
Category: |
|
Opps ID: | NBD00159670938704404 |
Posted Date: | Sep 26, 2023 |
Due Date: | Nov 2, 2023 |
Source: | https://sam.gov/opp/7b73d15a92... |
Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.
- Contract Opportunity Type: Solicitation (Original)
- All Dates/Times are: (UTC-06:00) MOUNTAIN STANDARD TIME, DENVER, USA
- Original Published Date: Sep 26, 2023 03:09 pm MDT
- Original Date Offers Due: Nov 02, 2023 02:00 pm MDT
- Inactive Policy: Manual
- Original Inactive Date: Dec 02, 2023
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: Y1LB - CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
-
NAICS Code:
- 237310 - Highway, Street, and Bridge Construction
-
Place of Performance:
Fairfield , ND 58627USA
The Central Federal Lands Highway Division (CFLHD) of the Federal Highway Administration (FHWA), in cooperation with Billings County and U.S. Forest Service (USFS), are proposing construction of ND FLAP 704(1) and 795(1) Magpie and Whitetail Crossings, to provide safe travel and allow consistent access across Magpie Creek (Magpie Road) and Whitetail Creek (Whitetail Road). The existing routes have informal low water crossings with negligible hardened surfacing which are in poor condition and are impassable during storm events.
SCOPE OF THE WORK:
The scope of this project will include the construction of structures across Magpie Creek and Whitetail Creek to allow the passage of vehicles. Work will also include roadway work for the stream crossing approaches as appropriate.
The Magpie Crossing will include the replacement of the existing low water crossing with a multi-span bridge structure over Magpie Creek. It will also include adjacent roadway reconstruction leading up to the bridge structure including gravel surfacing.
The Whitetail Crossing will include removal and replacement of the existing low water crossing to include an AOP precast reinforced box culvert structure including approach work; and roadway reconstruction including sight distance improvements and gravel surfacing. The crossing location will straighten the roadway through this section leading up to the Whitetail Picnic Area
Document | File Size | Access | Updated Date |
|
4 MB
|
Public |
Sep 26, 2023
|
|
30 MB
|
Public |
Sep 26, 2023
|
|
3 MB
|
Public |
Sep 26, 2023
|
|
1 MB
|
Public |
Sep 26, 2023
|
|
14 MB
|
Public |
Sep 26, 2023
|
|
6 MB
|
Public |
Sep 26, 2023
|
|
4 MB
|
Public |
Sep 26, 2023
|
- 12300 W. DAKOTA AVE
- LAKEWOOD , CO 80228
- USA
- Eric Grosskreuz
- CFLConracts@dot.gov
- Jorey Deml
- CFLConracts@dot.gov
- Sep 26, 2023 03:09 pm MDTSolicitation (Original)
- Aug 24, 2023 01:57 pm MDT Sources Sought (Updated)
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.