ND FLAP 704(1) AND 795(1) Magpie & Whitetail Crossings
Agency: | |
---|---|
Level of Government: | Federal |
Category: |
|
Opps ID: | NBD00159821369687620 |
Posted Date: | Nov 3, 2023 |
Due Date: | Nov 2, 2023 |
Source: | https://sam.gov/opp/cd0c2457a2... |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Solicitation (Updated)
- All Dates/Times are: (UTC-06:00) MOUNTAIN STANDARD TIME, DENVER, USA
- Updated Published Date: Nov 03, 2023 09:21 am MDT
- Original Published Date: Sep 26, 2023 03:09 pm MDT
- Updated Date Offers Due: Nov 02, 2023 02:00 pm MDT
- Original Date Offers Due: Nov 02, 2023 02:00 pm MDT
- Inactive Policy: Manual
- Updated Inactive Date: Dec 02, 2023
- Original Inactive Date: Dec 02, 2023
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: Y1LB - CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
-
NAICS Code:
- 237310 - Highway, Street, and Bridge Construction
-
Place of Performance:
Fairfield , ND 58627USA
The Central Federal Lands Highway Division (CFLHD) of the Federal Highway Administration (FHWA), in cooperation with Billings County and U.S. Forest Service (USFS), are proposing construction of ND FLAP 704(1) and 795(1) Magpie and Whitetail Crossings, to provide safe travel and allow consistent access across Magpie Creek (Magpie Road) and Whitetail Creek (Whitetail Road). The existing routes have informal low water crossings with negligible hardened surfacing which are in poor condition and are impassable during storm events.
SCOPE OF THE WORK:
The scope of this project will include the construction of structures across Magpie Creek and Whitetail Creek to allow the passage of vehicles. Work will also include roadway work for the stream crossing approaches as appropriate.
The Magpie Crossing will include the replacement of the existing low water crossing with a multi-span bridge structure over Magpie Creek. It will also include adjacent roadway reconstruction leading up to the bridge structure including gravel surfacing.
The Whitetail Crossing will include removal and replacement of the existing low water crossing to include an AOP precast reinforced box culvert structure including approach work; and roadway reconstruction including sight distance improvements and gravel surfacing. The crossing location will straighten the roadway through this section leading up to the Whitetail Picnic Area
- 12300 W. DAKOTA AVE
- LAKEWOOD , CO 80228
- USA
- Eric Grosskreuz
- CFLConracts@dot.gov
- Jorey Deml
- CFLConracts@dot.gov
- Nov 03, 2023 09:21 am MDTSolicitation (Updated)
- Nov 01, 2023 09:55 pm MDT Sources Sought (Updated)
- Oct 31, 2023 11:26 am MDT Solicitation (Updated)
- Oct 31, 2023 08:42 am MDT Solicitation (Updated)
- Oct 27, 2023 07:32 am MDT Solicitation (Updated)
- Oct 26, 2023 04:11 pm MDT Solicitation (Updated)
- Oct 26, 2023 03:43 pm MDT Solicitation (Updated)
- Sep 26, 2023 03:09 pm MDT Solicitation (Original)
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.